Kohler K-10087-9-CP Guide d'installation Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
2. Complete the Valve Installation
If you have not already done so, install supply stops.
Install copper tubing between the valves and the supply stops.
Temporarily pull the plaster guards from the handle shanks and
spout shank. Do not discard them at this time.
Position a bucket in front of the spout shank, then open the water
supplies and the valves.
Close the valves and the water supplies, then carefully inspect all
connections for leakage. Repair if necessary.
Turn off the water supplies. Open the valve stems to relieve the
water pressure.
Reattach the plaster guards.
3. Finish the Wall
NOTE: To ensure proper fit and appearance, do not oversize the
holes for the handle shanks and spout shank.
Complete the finished wall with three 1-1/2 (3.5 cm) diameter
holes for the spout and handle shanks. Space the hole centers 4
(10.2 cm) apart.
Remove and discard the plaster guards when the finished wall is
complete.
1-1/2"
(3.8 cm) D.
Finished
Wall
Plaster
Guards
Handle
Shank
Spout
Shank
Plaster Guards
1/2" Cold
Supply
Handle
Shank
1/2" Hot
Supply
4" (10.2 cm)
Kohler Co. 5 1139731-2-A
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 ... 23 24

Commentaires sur ces manuels

Pas de commentaire