1. Prepare the Site
NOTE: Follow the instructions packed with your steam head and control panel kit.
NOTICE: The steam head must be installed at least 6 (15.2 cm) from the floor in an area where contact
with occupants is unlikely.
NOTICE: Provide clearance between the back wall and the elbow. The elbow should not contact the back
wall.
NOTE: The edge of the hole should be at least 1 (2.5 cm) away from all wall studs.
Drill a 2-1/2 (6.4 cm) diameter hole in the wall at the desired steam head location.
NOTE: For all the connections, use thread sealant tape and do not overtighten the fittings.
Install a 1/2 NPT connection on the end of the steam housing assembly.
Secure the connection to the framing whenever possible.
NOTE: The steam generator(s) will not operate without water and a connected user interface control.
6" (15.2 cm) from Floor
4" (10.2 cm)
Min
Provide clearance
from wall.
Wall Stud
2-1/2" (6.4 cm)
1" (2.5 cm) Min
Kohler Co. 3 1008020-2-E