Prepare the Site (cont.)
For all installations:
Ensure the drain is on center at the marked locations using a
level. Adjust as needed.
Install the bath shell according to the bath manufacturer’s
instructions. Ensure the bath shell is lined up with the overflow
outlet and drain outlet before securing the bath. Do not install the
bath apron until instructed to do so.