Kohler K-2449-F2 Guide d'installation Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 32
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
3. Install the Vanity
Position the vanity against the finished wall.
Verify the vanity is level. If it is not level, tip the vanity to allow
access to the appropriate leveler(s) and turn the leveler(s)
counterclockwise to raise the vanity, or clockwise to lower it.
Mark two pilot holes an equal distance from the centerpoint of
the mounting rail.
Drill two pilot holes through mounting rail at the marked
locations.
Tighten a wood screw through each of the two drilled holes until
the vanity is flush and secure against the finished wall.
Leveler
Mounting Rail
Wood Screw
Vanity
Finished Wall
1061207-2-A 6 Kohler Co.
Vue de la page 5
1 2 3 4 5 6 7 8 9 10 11 ... 31 32

Commentaires sur ces manuels

Pas de commentaire