3. Complete the Installation
Ensure that both faucet handles are turned off (hot =
counterclockwise to close, cold = clockwise to close).
Turn on the water supplies and check the installation for leaks.
Repair as needed.
Remove the aerator.
Open the valves and run water through the spout for about a
minute to remove any debris. Check for leaks.
Remove all debris from the aerator.
Turn the valves off, and reinstall the aerator.