Before You Begin (cont.)
Follow all local plumbing and electrical codes. All electrical work should be done by a qualified
electrician.
Disconnect all power before making any electrical connections.
Connect the steam generator to water supply lines that meet all applicable plumbing codes.
For custom installations, locate the steam head 6 (15.2 cm) from the floor and 4-1/2 (11.4 cm) from
the inside of the threshold.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
Kohler Co. 3 1053772-2-D