Kohler CV1000 Manuel d'utilisateur Page 105

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 138
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 104
Section 9
Inspection and Reconditioning
9
9.13
O-Ring
3
2
1
4
4. Install the O-Ring in the groove of the oil pump
housing. Use a small quantity of grease to hold it
in place. See Figure 9-16.
Figure 9-16. O-Ring Installed in Oil Pump Housing.
5. Lightly lubricate the I.D. of the inlet seal with
oil and carefully insert the end of the pickup
through the seal, into the oil pump housing.
6. Install the oil pump housing with the pickup
tube, over the oil pump boss and gears. Position
ȱȱȱĝȱȱȱŘȱȱřǯȱȱȱ
three screw hole locations.
Figure 9-17. Installing Oil Pump and Pickup.
7. Check the alignment of parts and torque the
ȱȱȱȱȱęȱȱȱ
ȱȱȱȱşȬŗŞǯ
ȱ ȱ ȱȱ¡ǯȱĚȱȱȱDZ
a. Install fastener into location No. 1 and
lightly tighten to position the pump.
b. Install fastener into location No. 2 and fully
torque to the recommended value.
c. Install fastener into location No. 3 and fully
torque to the recommended value.
d. Finish torquing fastener in location No. 1
to the recommended value.
First Time Installation: 10.7 N·m (95 in. lb.)
All Reinstallations: 6.7 N·m (60 in. lb.)
Figure 9-18. Oil Pump Screws Torque Sequence.
ȱ Şǯȱ ȱȱȱȱȱȱȱȱ
10.7 N·m (95 in. lb.) into a new hole, or 7.3 N·m
(65 in. lb.) into a used hole. See Figure 9-17.
Mounting
Screws
Pickup
Oil
Pump
%DIÀH
(Covering
Relief
Valve)
Pickup
Mounting
Screw
Vue de la page 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 137 138

Commentaires sur ces manuels

Pas de commentaire